Expert Risk Articles

For knowledge sharing worldwide, features on a variety of risk topics in both the AGCS in-house media and external publications.

Editor’s pick
Over-exposed - vineyard volatility amid a changing climate
01 August 2017

Climate disruptions are increasing in volatility throughout the world. Among one of the hardest hit is agribusiness – specifically wineries – which depend on stable soils and climatological consistency.

  • /assets/Thumbnails/Non-People%20Thumbnails/Insights/Expert%20Risk%20Articles/Industry4.0_106x70.jpg
    Smart factories of the future
    13 May 2016

    As the “Internet of Things” (“IoT”) evolves, tomorrow’s factories will look much different from today’s.

  • /assets/Thumbnails/Non-People%20Thumbnails/Insights/Expert%20Risk%20Articles/Industry4.0-Factory_106x70.jpg
    Industry 4.0: A new definition of manufacturing?
    01 June 2016

    The “post-information” age of augmented reality, big data, “clouds” and other technologies is upon us, but it necessitates refining existing and developing new risk services offered for manufacturing risks.

  • /assets/Thumbnails/Non-People%20Thumbnails/Insights/Expert%20Risk%20Articles/PowerMeltdown_106x70.jpg
    Cyber-attacks on critical infrastructure
    20 July 2016

    Critical infrastructure systems are interconnected to form the energy “grid”. Although beneficial to the public this grid is vulnerable to cyber-attack by hacktivists or terrorists. How can these perils be mitigated?

  • /assets/Thumbnails/Non-People%20Thumbnails/Insights/Expert%20Risk%20Articles/Recent-Dev_106x70.jpg
    Recent Developments: 2015 in Review
    05 April 2016

    From cargo liquefaction to opening of Iranian waters and from oil price fluctuations to Tianjin, 2015 saw surprises and some impactful losses.

  • /assets/Thumbnails/Non-People%20Thumbnails/Insights/Expert%20Risk%20Articles/SSR_CBM_106x70.jpg
    Condition-based maintenance and cargo weighing regulations
    21 March 2016

    Ship maintenance has traditionally been accomplished on a set interval of planned repair. Recently, however, a move to replace this method with condition-based maintenance strategies has enjoyed a rising interest.

Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24